Code: |
05ROAD0063
|
|
Category/Planning Area: |
Local / Area 5
|
|
Location: |
Dolphin Point/Burrill Lake
|
|
Description: |
Construction of roundabout, internal roundabout and link road at Dolphin Point (Princes Highway to Dolphin Point Road)
|
|
Strategy: |
To provide improved, efficient and safe public road networks for increasing traffic volumes associated with development demand.
|
|
Contribution Rate: |
Table control
|
|
View Larger Map (PDF)
|
Contribution map shaded areas indicate the Contribution Area(s). Red indicates Contribution Infrastructure.
|
Project Estimate: |
$1,616,078.00 in May 2005
|
Indexed Estimate:
|
|
Apportionment: |
Recoupment of cost apportioned to future development is 100%.
|
Nexus: |
The project ensures that new development pays an equitable apportionment of costs associated with providing a suitable road network which directly services demand created by development.
|
Supporting Information: |
Supporting Information can be found here.
|
Proposed Works: |
Not applicable. The project has been completed.
|
Land Acquisition Estimate: |
$0.00
|
Timing: |
Not applicable. The project has been completed.
|
|
|
|
|
Plan Effective:
23 Mar 2011 - As Amended (September 2014)
|
|