Code: 05DRAI2005  
Category/Planning Area: Local / Area 5  
Location: Ulladulla  
Description: New Street drainage pipeline (Entire street length)  
Strategy: To upgrade drainage infrastructure to facilitate development demand in this area
Contribution Rate:
Table control
Contribution map shaded areas indicate the Contribution Area(s). Red indicates Contribution Infrastructure.
View Larger Map (PDF)
Project Estimate: $33,916.00 in Dec 2009
Indexed Estimate:
Apportionment: Recoupment of cost apportioned to future development is 60.9%.
Nexus: The project is required to sustain development within the identified catchment / contribution area.
Supporting Information:
Supporting Information can be found here.
Proposed Works: Not Applicable. The project has been completed.
Land Acquisition Estimate: $0.00
Timing: Not Applicable. The project has been completed.
     
  Plan Effective: 23 Mar 2011 - As Amended (September 2014)