Code: 04CFAC2002  
Category/Planning Area: Local / Area 4  
Location: Sussex Inlet  
Description: Sussex Inlet Branch Library (Sussex Inlet urban precinct)  
Strategy: To provide the community with increased variety of activity and access to Information Technology that meets with user needs of growing social development demand.
Contribution Rate:
Table control
Contribution map shaded areas indicate the Contribution Area(s). Red indicates Contribution Infrastructure.
View Larger Map (PDF)
Project Estimate: $382,070.00 in May 2004
Indexed Estimate:
Apportionment: The apportionment to future development is 27.1%.
Nexus: The population accommodated in both existing and future development in Planning Area 4 up to 2026 will generate all of the need for this project. The contribution rate calculation therefore reflects this planning philosophy.
Supporting Information:
Supporting Information can be found here.
Proposed Works: Concept plan is not available.
Land Acquisition Estimate: $0.00
Timing: 2016/20
     
  Plan Effective: 23 Mar 2011 - As Amended (September 2014)