Code: 03ROAD0115  
Category/Planning Area: Local / Area 3  
Location: Huskisson  
Description: Sydney/Bowen Streets construction (From Owen to Hawke Streets)  
Strategy: To provide improved, efficient and safe public road networks for increasing traffic volumes associated with development demand.
Contribution Rate:
Table control
Contribution map shaded areas indicate the Contribution Area(s). Red indicates Contribution Infrastructure.
View Larger Map (PDF)
Project Estimate: $938,739.00 in Dec 2009
Indexed Estimate:
Apportionment: The apportionment to future development is 55.4%.
Nexus: The project is critical for ensuring that new development pays an equitable apportionment of costs associated with providing a suitable road network which directly services demand created by development. The demand for this project includes 4.76% assumed through traffic. This equates to $44,702 in Dec 2009 which is apportioned to Council.
Supporting Information:
Supporting Information can be found here.
Proposed Works: Concept plan is not available.
Land Acquisition Estimate: $0.00
Timing: 2016/20
     
  Plan Effective: 23 Mar 2011 - As Amended (September 2014)