Code: |
01ROAD3082
|
|
Category/Planning Area: |
Local / Area 1
|
|
Location: |
Bugong
|
|
Description: |
Bugong Road gravel upgrade (For 8km from Illaroo Road)
|
|
Strategy: |
To provide improved, efficient and safe public road networks for increasing traffic volumes associated with development demand.
|
|
Contribution Rate: |
Table control
|
|
View Larger Map (PDF)
|
Contribution map shaded areas indicate the Contribution Area(s). Red indicates Contribution Infrastructure.
|
Project Estimate: |
$1,224,709.00 in Nov 2010
|
Indexed Estimate:
|
|
Apportionment: |
The apportionment to future development is 50.16%.
|
Nexus: |
The project is critical for ensuring that new development pays an equitable apportionment of costs associated with providing a suitable road network which directly services demand created by development. The demand for this project includes 10% assumed through traffic which equates to $122,471 in Nov 2010 and is apportioned to Council
|
Supporting Information: |
Supporting Information can be found here.
|
Proposed Works: |
Concept plan is not available.
|
Land Acquisition Estimate: |
$0.00
|
Timing: |
2018/22
|
|
|
|
|
Plan Effective:
23 Mar 2011 - As Amended (September 2014)
|
|